Case Studies


Case Study - Jaguar VXT Motor Generator Set Solution...Click here to read more.

Case Study - Jaguar VXT Motor Generator Set Solution

Case Study - Jaguar VXT Motor Generator Set Solution
The customer - Liberty Specialty Steels - were looking for an energy saving solution that removed the need for a motor generator base load to supply some high frequency hand held grinders...Click here to read more.

Case Study - Jaguar VXH Heating & Ventilation Solution

Case Study - Jaguar VXH Heating & Ventilation Solution
The customer - a London-based European Bank - approached TH Electrical Ltd from Colchester to carry out some repairs on their existing HVAC system which was located on the 5th floor roof. The existing system which used a Tasc Variable Speed Unit that employed an electromagnetic coupling...Click here to read more.

Case Study - iSmart Training Centre Lighting Solutions

Case Study - iSmart Training Centre Lighting Solutions
The customer - Liberty Specialty Steels - were looking for a lighting solution for their apprentice training centre. The 25 year old system which needed replacing, utilised high bay light fittings which were left on all the time, even though the training centre operated from 8am to 6pm...Click here to read more.

Case Study - SD1 Diamond Wire Quarry Machinery

Case Study - SD1 Diamond Wire Quarry Machinery
The customer, one of the largest manufacturers of automation machinery for use in the stone field, required a dual solution for one of their marble cutting machines. After careful evaluation, the customer opted to utilise two IMO SD1 AC variable speed drives...Click here to read more.

Case Study - Solar Cube Canada

Case Study - Solar Cube Canada
IMO Canada was approached to offer a reliable solution for solar tracking control to replace existing programmable relays and time-based PLC tracking controls. The client indicated a large number of high quality; 2 axis solar arrays built on rural and farm properties that were starting to fail.......Click here to read more.

Case Study - i3A Solar Thermal Solution

Case Study - i3A Solar Thermal Solution
The customer is a competent and successful designer and installer of solar thermal systems. On receiving an out of the ordinary large system enquiry he contacted IMO to discuss their range of combined HMI and PLC controllers....Click here to read more.

Case Study - i3A Lobster Containment Solution

Case Study - i3A Lobster Containment Solution
The customer required remote alarm messaging in case of any critical system faults to a sometimes unmanned live Lobster containment facility...Click here to read more.

Case Study - i3C Vineyard Irrigation Solution

Case Study - i3C Vineyard Irrigation Solution
The customer required improved Vineyard irrigation system control and diagnostics from the standard conventional controller. After a customer consultation the i3C was deemed the most suitable and cost effective solution...Click here to read more.

Case Study - i3 Biomass Solution

Case Study - i3 Biomass Solution
The OEM had a requirement for a control system capable of operating as "standalone" or as part of a networked system, where remote monitoring/support could be offered. The IMO i3 range of Integrated Controller easily satisfies this requirement, with its easy to use programming software and remote connectivity packages. The IMO solution is the solution of choice for OEM's...Click here to read more.

Case Study - i3C BMS Solution

Case Study - i3C BMS Solution
The client required a replacement BMS controller to replace the existing ineffective unit. After a site survey, the integrator selected an IMO Intelligent Control Station (i3) as an ideal solution for the application...Click here to read more.

Case Study - i3D OEE Data Collection

Case Study - i3D OEE Data Collection
To improve productivity the client wished to monitor overall equipment effectiveness of the grain processing and cleaning line. The client preference was to use the i3D integrated controller with iSmart intelligent relays to collect the digital input data...Click here to read more.

Case Study - i3D Robot Pick & Place Solution

Case Study - i3D Robot Pick & Place Solution
The end user required a system to replace a complicated robot interface and machine operating system which was difficult to use. After a site survey, the IMO integrator selected the i3D as the ideal solution, owing to its 10.4" touchscreen display and multiple communications options...Click here to read more.

Case Study - Jaguar Powering Lift industries

Case Study - Jaguar Powering Lift industries
IMO engineers completed a full evaluation at a customer's site where they had a requirement to gain better control over their ageing large gantry crane. It was determined that a Jaguar VXM Variable Speed Drive would meet the requirements of the application...Click here to read more.

Case Study - Water & Waste Industries

Case Study - Water & Waste Industries
Imagine being able to see what's happening in the plant from your home, a hotel room or somewhere miles away! Or being alerted to a problem with a system as soon as it is detected from anywhere in the world. IMO's powerful i3 controller can make that possible ...Click here to read more.

Case Study - Specialist Vehicle Industries

Case Study - Specialist Vehicle Industries
The i3 Controller is already being used in a wide range of specialist vehicles including, Custodial, Fire and Cash In Transit. Another example of how the i3 can be used, is in state of the art Police Vehicles that contain a variety of high tech equipment and software systems...Click here to read more.

Case Study - The only inverter in the world to underwrite your energy savings

Case Study - The only inverter in the world to underwrite your energy savings
As the awareness of Energy Saving has increased, IMO has used its 25 years of inverter technology experience to develop its “5 Stage Pentagon Plan” delivering an unrivalled solution to your energy saving needs. ...Click here to read more.

Case Study - Jaguar drives mixers to €1000 per day energy saving.

Case Study - Jaguar drives mixers to €1000 per day energy saving.
IMO is enabling a manufacturer of paper bleaching agents to fight back against rapidly rising energy costs. The manufacturer, Tielle S.R.L. is benefiting from savings of €1000 per day in production costs following the installation of 8 – 280kW IMO Jaguar drives to grinding mixers at its plant in North West Italy.

“This application ably demonstrates the potential for energy saving with AC drives, outside of the normal areas such as pumps, fans and compressors,” said Rob Robbins, IMO Product Manager for Drives. “The rapid rise in the price of oil is hurting manufacturers all across Europe; but with applications like this we are opening up possibilities for reducing energy costs across a wider area of the company's operations....Click here to read more.

Case Study - Trent Concrete look to IMO Jagaur Drives to deliver

Case Study - Trent Concrete look to IMO Jagaur Drives to deliver
IMO Jaguar AC drives have solved two production problems for Trent Concrete, one of the UK’s most prestigious producers of high quality bespoke architectural cladding and structures. The Jaguar drives have been applied to a slip ring motor on a crane long travel drive, and a dimensional saw, providing increased productivity and superior positioning control (on the crane), and improved safety as a result of much faster braking on the woodworking saw. ...Click here to read more.

Case Study - IMO Jaguar Drives keeps Victorian pumping station pumping.

Case Study - IMO Jaguar Drives keeps Victorian pumping station pumping.
IMO Precision Controls has donated necessary engineering products to Papplewick Pumping Station which over the years has seen an extensive restoration programme completed to keep the site moving as Britain’s finest example of Victorian Water Works.

Based on the outskirts of Nottingham, Papplewick Pumping station was built between 1882 and 1884 to supplement the water supply for the growing Midlands city. Today the engine house is home to the original twin beam engineer, thought to be the last built by the famous firm of James Watt & Co ...Click here to read more.

Case Study - Jaguar Drives make a splash with energy saving swimming pools, at Thistle Hotels.

Case Study - Jaguar Drives make a splash with energy saving swimming pools, at Thistle Hotels.
Motor speed control offers industry the single largest opportunity for saving energy and money.

Most motors run at a fixed speed, by adjusting the speed to more accurately match the requirements of the loads, which generally vary over time, you can enhance the efficiency of the motor drive equipment. The potential benefits of speed variation include increased productivity and product quality, less wear and mechanical stress, along with energy savings of 50% or more for some types of applications.

One of the most effective ways to save energy is to target pump and fan applications, firstly because there are so many of them and secondly because the potential energy savings are so great. ...Click here to read more.